Before you start repairing a house or apartment, it is very important to make the most detailed action plan. This will allow us to set priorities correctly and, ultimately, to do all the work as efficiently and quickly as possible. In addition, the preliminary plan will give a more or less accurate idea of the costs of funds that are coming during the repair.
The specific plan will largely depend on what kind of repairs you will have: office, apartment, house reconstruction, etc. You also need to take into account whether it will be just cosmetics or major repairs with the replacement of all communications and / or redevelopment. After you have defined in general terms what you need, you will need to make a detailed list of all the work and alterations that you will have to do. And only after that, you can make a plan where the order will be indicated, as well as the approximate time and financial costs of each stage of repair.
Surely, many of you have heard that repairs need to be carried out from top to bottom. This statement is generally true, but it concerns only internal work. If you are going to have a major reconstruction of a country house, then there are slightly different rules here: first, the roof is repaired, then the foundation, then the communications are replaced, after that the walls are updated and only then proceed to the interior decoration. The logic in this case is simple – roof leaks, as well as excess moisture from the ground, can cause the development of mold and mildew on the walls. Therefore, the "middle" part of the house is left for later, as well as all internal work, because the decoration can very quickly become unusable due to external defects of the structure.
With apartments, everything is much easier, since there is no need to think about outdoor repairs, however, a plan with the order of work is also needed and important here. In the apartment where they lived before you, the first thing you need to determine where the main communications are, as well as assess their current state, that is, find out what needs to be replaced and what can be left as is. After that, all dismantling works are carried out from top to bottom (ceiling, walls, communications, floor), rough finishing works (laying new communications, leveling surfaces, plaster and putty) and, finally, finishing works (painting, wallpapering, laying flooring, etc.), and also from top to bottom. When the walls and floors are finished, the interior doors are mounted and furniture is installed.
Many people ask: where to start apartment renovation? Here everything is the same as with the housing of the secondary market, except for the absence of the first stage – dismantling works. However, this does not mean at all that repairs in a new apartment are easier and cheaper than in an old one – in this case, laying of all communications is necessary, and not replacing individual ones, often floor screed and construction of interior partitions, installation of waterproofing in the bathroom, etc. Therefore, the repair of new housing also needs to be treated with full responsibility and think everything through carefully. Experience hassle-free gameplay at no verification casinos at